be identified by stenciling or other suitable marking. Tiedown marking shall
clearly indicate that the attachments are intended for the tiedown of the
conveyor on the carrier when shipped.
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the
contract or purchase order, the contractor is responsible for the performance of
all inspection requirement as specified herein. Except as otherwise specified
in the contract or purchase order, the contractor may use his own or any other
facilities suitable for the performance of the inspection requirements specified
herein, unless disapproved by the Government. The Government reserves the right
to perform any of the inspections set forth in the specification where such
inspections are deemed necessary to assure supplies and services conform to
prescribed requirements.
4.1.1 Component and material inspection. Components and materials shall be
inspected in accordance with all the requirements specified herein and in
applicable referenced documents.
Classification of inspections. The inspection requirements specified
4.2
herein are classified as follows:
a.
First article inspection (see 4.2.1).
b.
Quality conformance inspection (see 4.2.2).
4.2.1 First article inspection. The first article inspection shall be
performed on one conveyor when a first article is required (see 3.2 and 6.5).
This inspection shall include the examination of 4.3 and the tests of 4.4.2.
The first article may be either a first production item or a standard production
item from the supplier's current inventory provided the item meets the
requirements of the specification and is representative of the design,
construction, and manufacturing technique applicable to the remaining items to
be furnished under the contract. When a first article test is specified in the
contract and the contractor desires to deliver a test unit as a contract item,
it shall be delivered as the last item on the contract only after the
contractor, at his own cost and expense, shall have completely cleaned,
reconditioned and overhauled the unit (restored to like-new), making such
replacement and modifications thereto as are required to make the unit
acceptable as a contract item.
4.2.2 Quality conformance inspection. The quality conformance inspection
shall include the examination of 4.3, the tests of 4.4.1, and the packaging
inspection of 4.5.
4.3 Examination. Each conveyor shall be examined for compliance with the
requirements specified in section 3 of this specification. Any redesign or
modification of the contractor's standard product to comply with specified
requirements, or any necessary redesign or modification following failure to
meet specified requirements shall receive particular attention for adequacy and
suitability. This element of inspection shall encompass all visual examinations
and dimensional measurements. Noncompliance with any specified requirements or
presence of one or more defects preventing or lessening maximum efficiency shall
constitute cause for rejection. Any modifications or design changes after the